beautypg.com

To verify the expressmodule installation – Sun Microsystems Gigabit Ethernet MMF/UTP Adapter User Manual

Page 53

background image

Chapter 2

Installing the Adapter

19

3. Press the Attention button.

The power LED should blink about 10 times then remain a steady green light.

To Verify the ExpressModule Installation

1. Use the cfgadm command to verify the ExpressModule installation:

If the ExpressModule is properly installed and connected, you should see output
similar to the following:

2. Use the dladm show-dev command to verify that the link is up.

You should see output similar to the following:

# cfgadm

Ap_Id

Type

Receptacle

Occupant

Condition

pcie5 etherne/hp connected configured ok

# dladm show-dev

e1000g2

link: up

speed: 1000

Mbps

duplex: full

e1000g3

link: up

speed: 1000

Mbps

duplex: full