Table 24: Site Preparation Checklist (continued)
Date
Performed By
For More Information
Item or Task
“Rack Requirements for EX3200 and
EX4200 Switches” on page 87
“Cabinet Requirements for EX3200
and EX4200 Switches” on page 89
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX3200 and EX4200 Switches” on
page 91
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
“Requirements for Mounting an
EX3200 or EX4200 Switch on a
Desktop or Wall” on page 90
Verify that the wall meets the minimum
requirements for the installation of the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX3200 and EX4200 Switches” on
page 91
Verify that there is appropriate clearance in
your selected location.
Cables
Acquire cables and connectors:
■
Determine the number of cables needed
based on your planned configuration.
■
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
Related Topics
■
General Safety Guidelines and Warnings for EX Series Switches on page 207
■
General Site Guidelines for EX Series Switches on page 83
■
Installing and Connecting an EX3200 or EX4200 Switch on page 113
■
Mounting an EX3200 or EX4200 Switch on page 116
82
■
Site Preparation Checklist for EX3200 and EX4200 Switches
Complete Hardware Guide for EX3200 and EX4200 Ethernet Switches