2. In the Node pane, click the icon of the node you want to verify
3. Click the

Notebook

icon on the tool bar

v

When the Notebook window opens, make certain that the

Node Status

tab is selected

4. The

Node failure:

attribute displays the status of the node supervisor

v

No

displayed in a green box indicates that the node supervisor has not failed and the supervisor

is responding

v

Yes

displayed in a red box indicates that the node supervisor has failed and it is not responding

Note: Clicking

Help

in the Notebook window’s lower right corner displays attribute descriptions.

Frame supervisor verification

From the Hardware Perspectives window:
1. Unless you have saved display settings, the Hardware Perspective does not open with a frame pane

displayed. To open a frame pane:

a. Click the

Add Pane

icon on the tool bar

v

The Add Pane dialog box opens

b. From the

Pane Type

pull down, select

Frames and Switches

c. Select your choice of adding the pane to the current window or to a new window

d. If desired, enter a new pane title

e. Click

OK

to open the pane and close the dialog box

v

You may repeat these steps to add additional frame panes

2. In the Frame and Switch pane, click the icon of the frame you want to verify
3. Click the

Notebook

icon on the tool bar

v

When the Notebook window opens, make certain that the

Frame Status

tab is selected

4. The

Controller responds:

attribute displays the status of the frame supervisor

v

OK

displayed in a green box indicates that the frame supervisor is responding

v

No response

displayed in a red box indicates that the frame supervisor is not responding

Note: Clicking

Help

in the Notebook window’s lower right corner displays attribute descriptions.

Switch supervisor verification

From the Hardware Perspectives window:
1. Unless you have saved display settings, the Hardware Perspective does not open with a switch pane

displayed. To open a switch pane:

a. Click the

Add Pane

icon on the tool bar

v

The Add Pane dialog box opens

b. From the

Pane Type

pull down, select

Frames and Switches

c. Select your choice of adding the pane to the current window or to a new window

d. If desired, enter a new pane title

e. Click

OK

to open the pane and close the dialog box

v

You may repeat these steps to add additional switch panes

2. In the Frame and Switch pane, click the icon of the switch you want to verify

v

A switch icon is displayed next to the frame icon only if a switch is installed in the frame

3. Click the

Notebook

icon on the tool bar

v

When the Notebook window opens, make certain that the

Switch Status

tab is selected

4. The

Node failure:

attribute displays the status of the switch supervisor.

v

No

displayed in a green box indicates that the switch supervisor has not failed and the

supervisor is responding to communication from the frame supervisor.

Chapter 3. Service procedures