beautypg.com

IBM RS/6000 SP User Manual

Page 109

background image

SPS assembly, placing into service position

3-9

SPS assembly, removing

4-2

SPS assembly, replacing

4-2

SPS assembly, replacing from service position

3-9

SPS fan control cable, removing

4-3

SPS fan control cable, replacing

4-4

SPS fans, removing

4-3

SPS fans, replacing

4-3

SPS front chassis cable

1-8

SPS partitioning

3-8

SPS power card, removing

4-6

SPS power card, replacing

4-7

SPS resources, removing

3-7

SPS resources, restoring

3-7

SPS supervisor card, removing

4-4

SPS supervisor card, replacing

4-5

SPS supervisor power cable, removing

4-5

SPS supervisor power cable, replacing

4-6

SPS Switch data cables

2-13

SPS switch inner chassis cable

1-8

SPS-8 Switch data cables

2-13

SPS, SPS-8 (feature)

5-2, 5-4, 5-6

SPS, SPS-8 switch (feature

5-4

SPS, SPS-8 switch (feature)

5-2, 5-6

SRN (Service Request Number) table for SP Switch

adapters

1-24

static-sensitive devices

4-1

supervisor verification

frame

3-5

node

3-4

switch

3-5

switch adapters (SP Switch), Service Request Number

(SRN) table

1-24

switch assembly from active configuration,

removing

3-7

switch assembly to active configuration, restoring

3-8

switch assembly, removing

4-2

switch assembly, replacing

4-2

switch cables (feature)

5-8

switch clock source, determining the correct

3-6

switch clock source, selecting the

3-6

switch clocks, selecting appropriate

3-6

Switch data cables, SPS

2-13

Switch data cables, SPS-8

2-13

switch fans, removing

4-3

switch fans, replacing

4-3

switch front chassis cable, removing

4-3

switch front chassis cable, replacing

4-4

switch function MAP

flowcharted

1-17

switch inner chassis cable, removing

4-5

switch inner chassis cable, replacing

4-6

switch inner chassis cable, SPS

1-8

switch partitioning

3-8

switch power card, removing

4-6

switch power card, replacing

4-7

switch power MAP

flowcharted

1-13

switch resources, removing

3-7

switch resources, restoring

3-7

switch supervisor card, removing

4-4

switch supervisor card, replacing

4-5

switch supervisor self-test

3-4

switch supervisor verification

3-5

T

tools overview, service

3-1

trademarks

A-1

U

unfencing nodes

3-8

updates on SP nodes, installing firmware

3-10

V

verification

frame supervisor

3-5

node supervisor

3-4

switch supervisor

3-5

using Perspectives

3-4

verification and isolation procedures

switch supervisor self-test

3-4

W

who should use book

xv

wrap plugs

1-4

Index

X-3