
SPS assembly, placing into service position
3-9
SPS assembly, removing
4-2
SPS assembly, replacing
4-2
SPS assembly, replacing from service position
3-9
SPS fan control cable, removing
4-3
SPS fan control cable, replacing
4-4
SPS fans, removing
4-3
SPS fans, replacing
4-3
SPS front chassis cable
1-8
SPS partitioning
3-8
SPS power card, removing
4-6
SPS power card, replacing
4-7
SPS resources, removing
3-7
SPS resources, restoring
3-7
SPS supervisor card, removing
4-4
SPS supervisor card, replacing
4-5
SPS supervisor power cable, removing
4-5
SPS supervisor power cable, replacing
4-6
SPS Switch data cables
2-13
SPS switch inner chassis cable
1-8
SPS-8 Switch data cables
2-13
SPS, SPS-8 (feature)
5-2, 5-4, 5-6
SPS, SPS-8 switch (feature
5-4
SPS, SPS-8 switch (feature)
5-2, 5-6
SRN (Service Request Number) table for SP Switch
adapters
1-24
static-sensitive devices
4-1
supervisor verification
frame
3-5
node
3-4
switch
3-5
switch adapters (SP Switch), Service Request Number
(SRN) table
1-24
switch assembly from active configuration,
removing
3-7
switch assembly to active configuration, restoring
3-8
switch assembly, removing
4-2
switch assembly, replacing
4-2
switch cables (feature)
5-8
switch clock source, determining the correct
3-6
switch clock source, selecting the
3-6
switch clocks, selecting appropriate
3-6
Switch data cables, SPS
2-13
Switch data cables, SPS-8
2-13
switch fans, removing
4-3
switch fans, replacing
4-3
switch front chassis cable, removing
4-3
switch front chassis cable, replacing
4-4
switch function MAP
flowcharted
1-17
switch inner chassis cable, removing
4-5
switch inner chassis cable, replacing
4-6
switch inner chassis cable, SPS
1-8
switch partitioning
3-8
switch power card, removing
4-6
switch power card, replacing
4-7
switch power MAP
flowcharted
1-13
switch resources, removing
3-7
switch resources, restoring
3-7
switch supervisor card, removing
4-4
switch supervisor card, replacing
4-5
switch supervisor self-test
3-4
switch supervisor verification
3-5
T
tools overview, service
3-1
trademarks
A-1
U
unfencing nodes
3-8
updates on SP nodes, installing firmware
3-10
V
verification
frame supervisor
3-5
node supervisor
3-4
switch supervisor
3-5
using Perspectives
3-4
verification and isolation procedures
switch supervisor self-test
3-4
W
who should use book
xv
wrap plugs
1-4
Index
X-3