beautypg.com

IBM RS/6000 SP User Manual

Page 108

background image

frame locations

2-3, 2-5, 2-6

frame naming standard

2-1

frame supervisor verification

3-5

front chassis cable, SPS

1-8

front view of 49-inch frame locations

2-4

front view of frame locations

2-3

front view of multi-switch frame locations

2-4

H

handling static-sensitive devices

4-1

I

installing adapter microcode packages

3-10

installing firmware updates on SP nodes

3-10

K

kerberos authentication

3-1

L

location diagrams of the RS/6000 SP components

component connector details

2-9

external cable routing

2-11

frame

2-6

frame cable routing path in rear of frame

2-9, 2-11

front view of 49-inch frame locations

2-4

front view of frame locations

2-3

front view of multi-switch frame locations

2-4

rear view of frame locations

2-5

locations

cable plug locations

2-1

connector details

2-1

location diagrams of RS/6000 SP components

2-1

M

major assembly naming standard

2-2

male wrap plug

1-4

microcode packages, installing adapter

3-10

multi-switch frame (F/C 2030/1)

5-11

multi-switch frame locations

2-4

N

naming standard

assembly

2-2

connector location

2-2

for RS/6000 SP components

2-1

format structure

2-1

frame

2-1

major assembly

2-2

node supervisor verification

3-4

nodes, fencing

3-8

nodes, unfencing

3-8

P

partitioning, SPS

3-8

partitioning, switch

3-8

Perspectives, verification tests using

3-4

placing a SPS assembly into service position

3-9

Procedures

ESD

3-1

purpose of book

xv

task procedures overview

xv

R

rear view of frame locations

2-5

removing

4-1

switch assembly

4-2

switch fans

4-3

switch front chassis cable

4-3

switch inner chassis cable

4-5

switch power card

4-6

switch supervisor card

4-4

the RS/6000 SP components

4-1

removing a switch assembly from the active

configuration

3-7

removing switch resources

3-7

replacing

4-1

switch assembly

4-2

switch fans

4-3

switch front chassis cable

4-4

switch inner chassis cable

4-6

switch power card

4-7

switch supervisor card

4-5

the RS/6000 SP components

4-1

replacing a SPS assembly from service position

3-9

Requirements

ESD

3-1

restoring a switch assembly to the active

configuration

3-8

restoring switch resources

3-7

S

selecting appropriate switch clocks

3-6

selecting the switch clock source

3-6

service position procedures

3-9

service procedures

placing a SPS assembly into service position

3-9

removing switch resources

3-7

replacing a SPS assembly from service position

3-9

restoring switch resources

3-7

selecting appropriate switch clocks

3-6

service position procedures

3-9

verification and isolation procedures

kerberos authentication

3-1

Service Request Number (SRN) table for SP Switch

adapters

1-24

SP Switch adapters, Service Request Number (SRN)

table

1-24

SP Switch environment MAP

flowcharted

1-5

SP Switch high-level diagram

1-2

X-2

RS/6000 SP: SP Switch Service Guide