beautypg.com

Schedule, Cleaning & protecting – Grizzly 50/65 Ton Ironworker G0646 User Manual

Page 39

background image

G0646/G0647 50/65 Ton Ironworker

-37-

SECTION 6: MAINTENANCE

Always disconnect power

to the machine before

performing maintenance.

Failure to do this may

result in serious person-

al injury.

For optimum performance from your machine,
follow this maintenance schedule and refer to any
specific instructions given in this section.

Daily Check:

Loose mounting bolts.

Damaged tooling.

Worn or damaged wires.

Operating temperature of hydraulic fluid.

Any other unsafe condition.

Daily Maintenance:

Check/fill hydraulic reservoir level.

Check/fill lubricant in beam one-shot oiler.

Clean and protect all unpainted surfaces and
tooling.

Monthly Maintenance:

Lubricate as necessary (refer to

Lubrication

on

Page 38).

Clean built-up grime and debris from inside
cabinet and off motor.

Quarterly Maintenance:

Check/adjust beam alignment.

Annual Maintenance:

Drain, clean, and re-fill hydraulic system.

Schedule

Wipe away built-up grime and debris from all sta-
tions, tables, and tooling. Clean away any remain-
ing material with a solvent or mineral spirits prod-
uct such as the cleaner/degreaser from Grizzly
shown in

Figure 9 on Page 15.

When thoroughly clean and dry, protect the
unpainted metal surfaces with an application of
products like G96

®

Gun Treatment, SLIPIT

®

, or

Boeshield

®

T-9 (see

Section 5: Accessories on

Page 35 for more details).

At least once a month, open the bottom access
panels and clean off debris and grime from the
motor, pump, ram assembly, reservoir, and limit
stop assemblies.

Cleaning &

Protecting

This manual is related to the following products: