FUJITSU ServerView Virtual-IO Manager V3.1 User Manual
Page 263

Standard configuration before activating VIOM management
Figure 75: Standard configuration of the IBP 10/6 before activation
In this configuration, all server blades are linked with the standard uplink
set. The six uplink ports together form a LAG.
ServerView Virtual-IO Manager
263
7.4 VIOM internal operations on blade servers