beautypg.com

Weekly, Monthly, Quarterly – Heatcraft Refrigeration Products PARALLEL COMPRESSOR SYSTEMS 25000102 User Manual

Page 33: Annually

background image

Parallel Compressor Systems Installation & Operations Manual, October 2004

33

Parallel Compressor Systems

General Maintenance Schedule

(Service/Maintenance should be performed only by a qualified

/ certified refrigeration service technician.)

Weekly

Check refrigerant charge using the liquid line sight glass
Check compressor oil level
Check compressor crankcase heater operation
Check main power and control voltage
Check appearance of area around the unit
Check system pressures

Monthly

Check the refrigerant system for leaks
Check suction filters and liquid line filter driers.
Check all flanged connection bolts, fittings and line clamps

for tightness.
Inspect condenser fan blades and motor mounts for cracks,

loose set screws or mounting bolts.
Tighten all electrical connections.
Check operation and condition of contacts on compressor/

fan motor contactors. Check appearance of control panel

interior.
Check appearance of exterior conduit/junction boxes.
Check appearance of insulation.
Check operation of auxiliary equipment.

Quarterly











With unit in stable operation, record all operating conditions:

Suction/discharge/liquid refrigerant pressure(s) and

temperature(s).
System superheat, liquid subcooling, ambient

temperature.
Compressor amperage.
Test all operating and safety controls.

Annually

Obtain oil sample for analysis. Change oil if required.
Clean condenser coil.
Straighten condenser fins as required.
Change liquid line filter drier and suction filter cores.





Note: The above information is provided only

as a general guideline to aid servicing

personnel and equipment owners in

maintaining equipment. Due to variables

in the actual equipment application,

operating conditions, and environment

recommended service intervals may vary.