Preparation and unpack ing – MCZ Club HYDRO 15 kW User Manual
Page 24

PELLET STOVES
Chapter 3
INSTALLATION AND USE MANUAL
page
24
Installation and assembly
Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited
3.2. PREPARATION AND UNPACK ING
STAR and EGO stoves are delivered with two different packagings:
The EGO and MUSA stove has one packaging
o It contains the stove and the steel sides with the
profiles (Fig.1)
The STAR stove has two packagings
o One contains the stove and the profile for the ceramic
or the soapstone
o One contains the ceramic (fig.2). In this case there will
be a single packaging for the structure (the cardboard
with the ceramics will be placed above the packaging
with the structure)
o or Soapstone (fig.3) (in this case there are two
packagings structure + soapstone pallet)
SUITE and CLUB stoves are delivered in two packages placed
on top of each other:
o the first contains the stove
o The second contains the ceramic cladding. (Fig. 2)
EGO/STAR and MUSA stoves
Open the packaging, remove the four screws that secure the base of
the stove to the pallet, two to the right and two to the left (see figure
4), and position the stove in the selected place, ensuring that it is
complies with the above instructions.
Figure 1 – Example of packaging stove
+ steel sides (Ego stove)
Figure 3 - Example of soapstone
packaging
Figure 4 - Removing packaging screws (in
figure Ego stove)
Figure 2 - Example of packing for
ceramics
- Club HYDRO 15 kW High Efficiency Club HYDRO 15 kW Ver.2009 cod. 7109007 Club HYDRO 22 kW Club HYDRO 22 kW High Efficiency Ego HYDRO Ego HYDRO High Efficieny Musa HYDRO 15 kW Musa HYDRO 15 kW Ver.2009 cod. 7109008 Musa HYDRO 15 kW High Efficiency Musa HYDRO 22 kW Musa HYDRO 22 kW High Efficiency Star HYDRO Star HYDRO High Efficieny Suite HYDRO 15 kW Suite HYDRO 15 kW High Efficiency Suite HYDRO 15 kW Ver. 2009 cod. 7109007 Suite HYDRO 22 kW Suite HYDRO 22 kW High Efficiency