beautypg.com

Preparation and unpack ing – MCZ Club HYDRO 15 kW User Manual

Page 24

background image

PELLET STOVES

Chapter 3

INSTALLATION AND USE MANUAL

page

24

Installation and assembly

Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited

3.2. PREPARATION AND UNPACK ING

STAR and EGO stoves are delivered with two different packagings:

The EGO and MUSA stove has one packaging

o It contains the stove and the steel sides with the

profiles (Fig.1)

The STAR stove has two packagings

o One contains the stove and the profile for the ceramic

or the soapstone

o One contains the ceramic (fig.2). In this case there will

be a single packaging for the structure (the cardboard

with the ceramics will be placed above the packaging

with the structure)

o or Soapstone (fig.3) (in this case there are two

packagings structure + soapstone pallet)

SUITE and CLUB stoves are delivered in two packages placed

on top of each other:

o the first contains the stove
o The second contains the ceramic cladding. (Fig. 2)

EGO/STAR and MUSA stoves
Open the packaging, remove the four screws that secure the base of

the stove to the pallet, two to the right and two to the left (see figure

4), and position the stove in the selected place, ensuring that it is

complies with the above instructions.










Figure 1 – Example of packaging stove

+ steel sides (Ego stove)

Figure 3 - Example of soapstone

packaging

Figure 4 - Removing packaging screws (in

figure Ego stove)

Figure 2 - Example of packing for

ceramics