2.9. PLUMBING CONNECTION
IMPORTANT!
The connection of the stove to the plumbing
system must be carried out ONLY by specialized
personnel who are capable of carrying out
installation properly, in compliance with current
standards in the country of installation.
It is important that ONLY qualified engineers are
used to fit and commission the appliance in ALL
cases. The installing engineer MUST hold a QCF
recognised biomass qualification. Any company
using sub-contractors MUST ensure they also hold
the relevant qualifications.
If installation of the stove will involve interaction
with another, pre-existing system complete with
heating equipment (gas boiler, methane boiler,
fuel oil boiler, etc.), it is even more advisable to
call in qualified personnel, who subsequently will
be responsible for conformity of the system with
current applicable law.
MCZ will not be held responsible for damage to
persons or things in the event of failed or incorrect
operation if the aforementioned warnings are not
complied with.
For connection of the plumbing system to the stove, the user should
refer to chapter 3, INSTALLATION AND ASSEMBLY; specifically,
paragraph 3.4, CONNECTION TO PLUMBING SYSTEM
ONLY FOR UK
- Club HYDRO 15 kW High Efficiency Club HYDRO 15 kW Ver.2009 cod. 7109007 Club HYDRO 22 kW Club HYDRO 22 kW High Efficiency Ego HYDRO Ego HYDRO High Efficieny Musa HYDRO 15 kW Musa HYDRO 15 kW Ver.2009 cod. 7109008 Musa HYDRO 15 kW High Efficiency Musa HYDRO 22 kW Musa HYDRO 22 kW High Efficiency Star HYDRO Star HYDRO High Efficieny Suite HYDRO 15 kW Suite HYDRO 15 kW High Efficiency Suite HYDRO 15 kW Ver. 2009 cod. 7109007 Suite HYDRO 22 kW Suite HYDRO 22 kW High Efficiency