beautypg.com

Plumbing connection, Important – MCZ Club HYDRO 15 kW User Manual

Page 16

background image

PELLET STOVES

Chapter 3

INSTALLATION AND USE MANUAL

page

16

Installation and assembly

Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited

2.9. PLUMBING CONNECTION

IMPORTANT!

The connection of the stove to the plumbing

system must be carried out ONLY by specialized

personnel who are capable of carrying out

installation properly, in compliance with current

standards in the country of installation.
It is important that ONLY qualified engineers are

used to fit and commission the appliance in ALL

cases. The installing engineer MUST hold a QCF

recognised biomass qualification. Any company

using sub-contractors MUST ensure they also hold

the relevant qualifications.
If installation of the stove will involve interaction

with another, pre-existing system complete with

heating equipment (gas boiler, methane boiler,

fuel oil boiler, etc.), it is even more advisable to

call in qualified personnel, who subsequently will

be responsible for conformity of the system with

current applicable law.
MCZ will not be held responsible for damage to

persons or things in the event of failed or incorrect

operation if the aforementioned warnings are not

complied with.


For connection of the plumbing system to the stove, the user should

refer to chapter 3, INSTALLATION AND ASSEMBLY; specifically,

paragraph 3.4, CONNECTION TO PLUMBING SYSTEM

ONLY FOR UK