7 Procedure B
YASKAWA SIEP YEACOM 06A V1000 Option PROFINET SI-EP3/V Technical Manual
31
13.
Insert the LED operator cable from the front cover into port CN1 on the drive.
Figure 37
Figure 37 Insert LED Operator Cable to Drive CN1 Port
14.
Reattach the front cover of the drive using four bolts,
. Refer to
on page
for tightening
torque specifications.
NOTICE: Damage to Equipment. Take proper precautions when wiring the option so that the front covers will easily fit back onto the
drive. Make sure no cables are pinched between the front covers and the drive when replacing the cover. Failure to comply may result
in damage to circuitry and equipment.
Figure 38
Figure 38 Attach Cover to Drive
Table 9 Front Cover Installation Bolt Size and Tightening Torque
15.
Set drive parameters in
for proper option performance.
16.
End of Procedure B.
Voltage Class
Model No. CIMR-V
Installation
Screw Size
Tightening Torque
Nm
(lb-in)
Single Phase 200 V Class
BA0001 to BA0012
M5
2.0 to 2.5 (17.7 to 22.1)
Three Phase 200 V Class
2A0001 to 2A0020
M5
2.0 to 2.5 (17.7 to 22.1)
2A0030 to 2A0069
M6
5.4 to 6.0 (47.8 to 53)
Three Phase 400 V Class
4A0001 to 4A0011
M5
2.0 to 2.5 (17.7 to 22.1)
4A0018 to 4A0038
M6
5.4 to 6.0 (47.8 to 53)
Drive
CN1 Port
Inside front cover
Insert LED
operator cable
Front cover
Front cover screw
Drive