Cycle run – HEIDENHAIN TNC 620 (81760x-02) Cycle programming User Manual
Page 199

SIDE FINISHING (Cycle 24, DIN/ISO: G124, software option 19)
7.8
7
TNC 620 | User's Manual Cycle Programming | 2/2015
199
7.8
SIDE FINISHING (Cycle 24, DIN/ISO:
G124, software option 19)
Cycle run
With Cycle 24 SIDE FINISHING, you can clear the finishing
allowance for side that is programmed in Cycle 20. You can run this
cycle in climb or up-cut milling.
Before calling Cycle 24 you need to program further cycles:
Cycle 14 CONTOUR GEOMETRY or SEL CONTOUR
Cycle 20 CONTOUR DATA
Cycle 21 PILOT DRILLING, if necessary
Cycle 22 ROUGHING, if necessary
Cycle run
1 The TNC positions the tool above the workpiece surface to the
starting point for the approach position. This position in the
plane results from a tangential arc on which the TNC moves the
tool when approaching the contour.
2 The tool then advances to the first plunging depth at the feed
rate for plunging.
3 The contour is approached on a tangential arc until the entire
contour is completed. Each subcontour is finished separately.
4 Finally, the tool retracts in the tool axis to the clearance
height or to the position last programmed before the cycle.
This depends on the parameter ConfigDatum, CfgGeoCycle,
posAfterContPocket.