Rack mounting – Grass Valley M-2100 User Manual
Page 13

MMCP Installation/Operation Manual
1-5
Control Panel Installation
Rack Mounting
To mount the control panel in a standard 19 in. (483 mm) rack, use the rack
ears provided with the mounting option.
To rack mount the panel, perform the following steps:
1.
Install the rack ears to the right and left sides of the panel using the six
#8 screws provided as illustrated in
Figure 1-7. Install Rack Ears To Panel
2.
Mount the assembly to a standard rack using four standard rack screws
and washers (not provided).
Figure 1-8. MMCP Rack Mounting
Right side view
2.22 in.
56.38 mm
0.6 in.
15.24 mm
6X
(3 right and 3 left)
8129_08
Front view
19 in. / 483 mm
10.47 in.
266 mm
4X
8129_09
See also other documents in the category Grass Valley Equipment:
- LDK 5302 (24 pages)
- SFP Optical Converters (18 pages)
- 2000GEN (22 pages)
- 2011RDA (28 pages)
- 2010RDA-16 (28 pages)
- 2000NET v3.2.2 (72 pages)
- 2000NET v3.1 (68 pages)
- 2020DAC D-To-A (30 pages)
- 2000NET v4.0.0 (92 pages)
- 2020ADC A-To-D (32 pages)
- 2030RDA (36 pages)
- 2031RDA-SM (38 pages)
- 2041EDA (20 pages)
- 2040RDA (24 pages)
- 2041RDA (24 pages)
- 2042EDA (26 pages)
- 2090MDC (30 pages)
- 2040RDA-FR (52 pages)
- LDK 4021 (22 pages)
- 3DX-3901 (38 pages)
- LDK 4420 (82 pages)
- LDK 5307 (40 pages)
- Maestro Master Control Installation v.1.5.1 (455 pages)
- Maestro Master Control Installation v.1.5.1 (428 pages)
- 7600REF Installation (16 pages)
- 7600REF (84 pages)
- 8900FSS (18 pages)
- 8900GEN-SM (50 pages)
- 8900NET v.4.3.0 (108 pages)
- Safety Summary (17 pages)
- 8900NET v.4.0.0 (94 pages)
- 8906 (34 pages)
- 8911 (16 pages)
- 8900NET v.3.2.2 (78 pages)
- 8914 (18 pages)
- 8912RDA-D (20 pages)
- 8916 (26 pages)
- 8910ADA-SR (58 pages)
- 8920ADC v.2.0 (28 pages)
- 8920ADC v.2.0.1A (40 pages)
- 8920DAC (28 pages)
- 8920DMX (30 pages)
- 8920ADT (36 pages)
- 8920MUX (50 pages)
- 8921ADT (58 pages)