3-2 Making Process Connections
All Models
All FSS Series circulators have a bulkhead plate with the following
connections in the back:
• The system overflow connection, labeled Overflow, is the 1”
outlet for the system reservoir overflow. This should be
connected per local codes for a chemical drain and not to a
city drain.
• The city water “in” connection, labeled Water In, is the 1”
inlet leading from the customers city water make-up.
• The press process supply connection, labeled To Process, is
the 1” (1.5”) outlet for the supply solution to the press.
• The press process return connection, labeled From Process,
is the 1” (1.5”) inlet from the return pump/return tank.
• The condenser water “in” connection, labeled CHW In, is
the 1” connection from customers central chilling system
supply or from customer city water supply.
• The condenser water “out” connections, labeled CHW Out,
is the 1” connection to the customers central chilling water
return or to the customers city water return.
• The air supply connection for the systems return pump
controls, labeled Air In, is the ½” polytube connection from
the customers central air supply.
• The air supply connection for the return pump, labeled Air
Out, is the ½” polytube connection to the systems return
pump air inlet.
• The Etch Chemical connection, labeled “ETCH”, is the 3/8”
polytube connection from the chemical wand located in the
customers drum or tote.
• The Additive Chemical connection, labeled “ADDITIVE”,
is the 3/8” polytube connection from the chemcial wand
located in the customers drum or tote.