beautypg.com

5maintenance, 1 work rules, 2 maintaining pump packages – AEC VacTrac Series Conveying Systems User Manual

Page 85

background image

VacTrac™ Series Conveying Systems

Page 85

Mechanical Components

WH2-605A.4

5

Maintenance

5-1 Work Rules

The installation, operation, and maintenance of this equipment
must follow all applicable work and safety codes for the location
where it is used. This may include, but is not limited to, OSHA,
CSA, NEC, SPI, and other local, national, and international regu-
lations. In addition, you must observe the following specific rules:

;

Read and follow these instructions when installing, operating,

and maintaining your AEC equipment. If the instructions
become damaged or unreadable, you can obtain additional
copies from the Service Department at AEC, Inc.

;

Only qualified people may work on or with this equipment.

;

Work only with approved tools and devices.

;

Turn off and lock out the power switch when maintaining or

servicing your VacTrac system.

;

Disconnect and lock out main power before servicing electrical

equipment.

5-2 Maintaining Pump Packages

AEC VacTrac pump packages need periodic maintenance to
provide long dependable service. Check these elements regularly:

• Maintain a proper oil level in the blower gearbox. The

manufacturer’s brochure (packed with the pump package)
recommends oils, and lists instructions for checking the oil
level.

• Pack blower bearings with high temperature ball bearing

grease and change the oil to the manufacturer’s
recommendations.