beautypg.com

16 flange mount vacuum receiver mounting tips, 17 adjusting the vacuum receiver counterbalance, Tf and vf models only – AEC VacTrac Series Conveying Systems User Manual

Page 54

background image

Page 54

VacTrac™ Series Conveying Systems

WH2-605A.4

Mechanical Components

Remove all rubber banding and any other packaging

materials from around the flapper dump valve before
installation for proper operation.

Complete the vacuum and material tubing to the vacuum receivers.
Final connections are usually made with flexible hose.

Note: On single line Y systems, you must install a check valve

on the material inlet of each hopper. See Figure 16 on
Page 40.

3-16 Flange Mount Vacuum Receiver Mounting Tips

;

Run a bead of silicone sealant around the mounting flange

before seating the vacuum receiver. This makes a better seal.

;

Use rivets to mount the hopper. Nuts and bolts can loosen, fall

off, and damage process equipment.

;

Check across the mounting flange with a bubble level. A level

installation is important for proper operation.

;

Properly ground all vacuum receivers.

3-17 Adjusting the Vacuum Receiver Counterbalance

TF and VF Models Only

The counterbalance is factory-adjusted, but may have moved
during shipment. To adjust the vacuum receiver counterbalance:

1.

Loosen the set screw on the counterbalance. Move the
counterbalance so the flapper opens from

3

/

16

” (4 mm) to

1

/

4

(6 mm) on the end opposite the pivot. Re-tighten the set
screw.

2.

Apply removable thread locking compound to the set screw
and re-tighten.