Iindex – AEC VacTrac Series Conveying Systems User Manual
Page 113
VacTrac™ Series Conveying Systems
Page 113
Mechanical Components
WH2-605A.4
I
Index
ACA Series available models, 32
ACA Series filter bag life, 89
ACA Series filter chamber, inspecting filter bags,
88
ACA Series filter chamber, making compressed
air connections, 53
ACA Series filter chamber, making electrical
connections, 52–53
ACA Series filter chamber, operation, 81
ACA Series filter chamber, pre-operation
checklist, 81
ACA Series filter chamber, starting up units, 82
ACA Series filter chamber, typical, 30
ACA Series filter chambers, 31
ACA Series filter chambers, installation, 52
ACA Series Model 50 blowback DIP switch settings,
82
ACA Series Model 50 Low Boy filter assembly, 32
Adjusting bin level monitor sensitivity, Error! Not
a valid bookmark in entry on page 80
Atmospheric valves, 26
Audible alarm not functioning, 107
Audible/visual alarm on Volume Fill system signals
after the Press-To-Silence button is pressed, 107
Basic operation, 11
Basic system components, 10–11
Basic system types, 11
Cancelling No Convey alarm(s), 107
Component operation, 79–83
Compressed air connections drawing, 62, 63
Compressed air lines for proportioning vacuum
hopper/receiver, running, 64
Compressed air lines for remote proportioning
valve, running, 64
Control panel power drop wiring connections, 65
Control panels to vacuum hoppers/receivers,
connecting, 65
Copyright information, 2
Disclaimer information, 2
Electrical connections, 64
Equipment cycle, 10–11
Equipment function, 9
Fast takeoff compartments drawing, 59
Fast takeoff compartments, adjusting, 58
FC Series filters, bag-style, 29
Filter chamber filter cartridge obstructed too
frequently, 107
Filter chamber installation drawing, 50
Filter chamber shrouds, installing, 51
Filter chamber spare parts lists, 102
Filter chambers, installing, 48–50
Filter chambers, maintaining, 87
Flange mount vacuum hopper/receiver mounting
tips, 54
Grinder takeoff attachment drawing, 56
Grinder takeoff attachments, installing, 56
High vacuum relief regulator operation, 79
High-Vacuum alarm condition, 106
Incomplete shipment, 36
Incorrect shipment, 37
Inventory/vacuum receivers, installing, 53
Manifold Y-tube installation drawing, 43
Material check valve drawing, 48
Material check valves in single line Y-tube
systems, 47
Material sucked from filter chamber, through blower,
110
Material/vacuum tubing, installing, 41–45
Mechanical installation, 39
Modified single-line Y-tube installation drawing, 42
Multiple line system piping considerations, 45
Multiple line VacTrac system installation drawing, 46
Necessary Documents, 9
No-Convey alarm condition, 106
Parcel Post shipment, 36
Performance information, 2
Pickup probe drawing, 55
Pickup probes, installing, 55
Pickup tubes, 33
Powder check adapter drawing, 60
Powder check adapters, installing, 60
Pressure present at vacuum inlet, 105
Proximity sensor sensitivity, adjusting, 69–70
Pump package compressed air connections, 61
Pump package doesn't run even when on line, 105
Pump package power drop wiring connections, 64
Pump packages, maintaining, 85–86
Pumps, receivers on-line, but pumps not conveying
material, 107
Returns, 37
Safety considerations, 3
Sequence T-valves, 27
Shipping damages, 35
Shipping information, 35–37
Sight glass proximity sensor sensitivity,
adjusting, 70
Single line Y-tube system considerations, 45