7-4 final setup, Important – AEC OS Series Gravimetric Batch Blenders User Manual
Page 47
Page 46 of 118
4-7-4 Final Setup
1.
Connect the blender to the appropriate power source
.
2.
Connect the compressed air piping, ensuring that a 5-micron air
filter is installed, along with the proper water trap, and lubrication
unit, if required. Verify that 60 psi (4.14 bar) of clean, dry
compressed air is supplied to the blender.
Important!
Again, make sure that proper air supply connections are made to
the blender, as dirty, contaminated, wet air can damage blender
components and can quickly cause poor performance and
accuracy!
Make sure that the blender is supplied with clean, dry,
60 psi (4.14 bar) compressed air.
3. After powering up the blender and checking the safety circuit, use
the diagnostics menu to verify the following:
•
Load cell connections
•
Weigh hopper dump valve functions
•
Feeder unit functionality
•
Mixer motor function
•
Mixer high level switch function
4.
Calibrate the blender load cells (See Section 5-5).
5.
The blender should startup in “EZ” recipe mode. If so, enter a valid
recipe. If not, the blender can be reconfigured for EZ Recipe,
Percent, or Parts by entering the diagnostics menu and pressing
the “8” key. Then select the mode following the key prompt on the
screen.
6.
Startup the blender by selecting “1” (startup) from the main menu,
then select the batch mode operation. As soon as the blender
starts, press the “CLEAR” key at least three (3) times to clear any
inventory that may be in the register.