beautypg.com

Supplied materials, Rear panels – Verilink FrameStart FSD (34-00291.F) Product Manual User Manual

Page 18

background image

12

F r a m e S t a r t D D S C S U / D S U a n d T 1 C S U / D S U a n d F r a m e S t a r t F S E

inspection. Verilink will arrange for repair or replacement without waiting for
claim settlement.

Supplied Materials

The FrameStart family of products are shipped from the factory with the
following standard equipment:

AC power supply for the DDS and T1 CSU/DSU,
DC power supply for the FrameStart FSE (see Figure 2.3 on page 15)

Reference manual

8-pin to 8-pin network cable (p.n. 9 -1544 -009)

RJ48 to BNC adapter (for FrameStart FSE)

Rear Panels

The rear panel of the DDS and T1 CSU/DSU are identical as shown in Figure
2.1.

Figure 2.1

DDS and T1 CSU/DSU Rear Panel

The rear panel of the FrameStart FSE is shown in Figure 2.2.

Figure 2.2

FrameStart FSE Rear Panel