Sloan EW-72000 Installaton User Manual
Page 4

4
Mount Basin to Frame
A
Mount Basin to Frame using 1/4”-20 x 1/2” SEMS fasteners.
B
If desired, apply caulk between Basin and wall.
3
Mount Frame to Wall
4
Triple Station
Double Station
1/4”-20 x 1/2” Pan Head Screw (SEMS)
(Actual Size)
Note: If desired, Grid Strainers may be installed prior to mounting
Basin to the Frame. Refer to Step 5.
Triple Station
Double Station
FINISHED FLOOR
D
(See VARIABLE
MOUNTING
HEIGHT CHART
On Page 2)
C
For triple station sinks, reinstall the Front Panel
Support.
A
If desired, apply adhesive to back
surfaces of Frame.
B
Mount Frame to wall using 3/8" fasteners with 1000 lb min
pull out strength in the following locations:
1. Each hole in the extreme outer corners of top support
2. One of either of the two holes in the top position of each upright
3. The lower hole location in each upright
Fasteners may be optionally applied to any of the remaining mounting hole locations.
Level Frame in both directions before tightening fasteners securely.
Front Panel Support