Installation

General notes

The hot water heat pump is a factory-tested unit.

Once the water connections have been professio-

nally established, the storage tank has been filled

and the electrical connection (230 V/ 50 Hz) has

been established, it is possible to switch the unit

on.

WARNING!

The hot water heat pump must be connected

and put into operation exclusively by a certified

and authorised specialist!

WARNING!

It is necessary to fill the unit with water before

the electrical wiring is connected!

Sanitary connection and assembly

NOTICE!

If using copper and galvanised steel tubes

always observe the sequence in the flow direc-

tion: Copper after galvanised steel!

Avoidance of heat losses

In order to minimise heat losses plan the water

lines as short as possible and include thermal insu-

lation. Have the lines installed by a professional.

Sanitary installation

The direct connection with a stainless steel tank

must never be produced from copper or galvan-

ised. If a stainless steel tank is connected with a

galvanised cold water line (with the requisite fit-

tings or threaded connections) then a fine filter

must be fitted upstream of the stainless steel tank

in order to protect against rust particles, etc. Brass,

red brass, plastic and stainless steel are all suit-

able connection materials. If a stainless steel

storage tank is connected with a galvanised or

copper line then it is necessary to fit a red brass or

brass fitting between these parts.

It is possible to dispense with the use of a false

anode if the chloride content in the drinking

water is < 150 mg/l.

Always install a pressure reducer in the cold

water line.

Pressure reducer

Always install a pressure reducer in the cold water

supply line!

Safety valve

The safety valve prevents positive pressure from

building and serves to drain off the excess water,

which occurs due to expansion of the storage tank

contents when heated.

n

Only install a type-approved membrane safety

valve. This must be adjusted such that it safely

prevents the maximum permissible positive

operating pressure of the heat pump storage

tank - of 6 bar - from being exceeded by more

than 1 bar. The connection diameter of the

safety valve must be at least 1/2“. No shut-off

valve may be installed between the safety

valve and storage tank.

n

The drain line downstream of the drainage

funnel for the safety valve must exhibit twice

the cross-section of the safety valve connec-

tion, it must not lead outdoors and must not be

blocked. Drainage should take place exclu-

sively via the cold water connection or

drainage cock.

During the heating process, the expansion water

must visibly drip out of the safety valve drain (heat-

up time 4-7h!).

n

The hot water distribution system should be

configured without circulation.

n

The hot water lines must be thermally insulated

according to the local (municipal) regulations.

Charging with a second heat generator (solar,

combustible burner for solid fuel)

n

The supply and return lines must be thermally

insulated by design, and must be connected

such that no return or single tube gravity circu-

lation can arise with electric heating and the

circulation pump switched off.

n

The expansion of the heating water must be

guaranteed at all times (also with electric

heating).

n

Fit a bleeder at the top point in the hot water

line.

REMKO RBW