beautypg.com

Nortec DRAABE Pure Water System User Manual

Page 35

background image

Created: 21.09.2006
Changed: 29.02.2008
Printed: 02.03.2009

page 35 of 59


5.3.8

Low Pressure Circulation (Pressure Test)

-

Only PVC pressure pipe, PVC threaded joints and fittings in PVC pursuant to the ma-
terial specifications may be used.


-

The pipes are to be laid so that they are free of stress. The clamp distance may be at
most 1m.


-

The pipes may not be contaminated during installation.


-

The mounting height of the water drain funnel must lie below the safety overflow of the
water softener (drop of at least 5%).


-

When laying lines be sure direct sunlight and proximity to sources of heat are avoided.


-

When assembly is complete the pipe system is to be subjected to a hydraulic pressure
test of 3 bar, 44 psi (with water as medium). The console has been provided with a
hose bridge and a blind plug for this purpose.

Water softener

Discharge

Installation rail

Console

Drain

Rinsing pipe

Safty overflow

Hose bridge for
test of water thighness

Figure 18: Low Pressure Test