beautypg.com

Measurement Computing eZ-Balance rev.9.0 User Manual

Page 13

background image

eZ-Balance

987091

A Balancing Project 2-7

Operation:

Initial Balance Run

The first step is to perform an initial balance run. This is the “as found” condition of the machine.

Note: Data in graphics is for presentation purposes only.

On-line Method

Before acquiring vibration data, verify that your data acquisition device, e.g.,
ZonicBook/618E, WaveBook/516 Series, or IOtech 600 Series device is properly connected
and configured. Refer to your product user manual. IOtech CDs include PDF versions of the
associated documentation.

Main Display Window

Click the Toggle Switch in the Control Panel to enable the data acquisition. The Vibration Data table
(following figure) displays the measured Speed, 1x Amp, and 1x Phase values. After the machine reaches
a steady state, and data has been collected and averaged, you are ready to proceed to the next step.

Vibration Data Table

This manual is related to the following products: