beautypg.com

Legrand FP Series Activation Covers User Manual

Floorport, Series activation covers & barrier kits

background image

FloorPort

Series

Activation Covers & Barrier Kits

I N S T A L L A T I O N I N S T R U C T I O N S

Installation Instruction No.: 1 008 150 R2 – Updated April 2011

IMPORTANT: Please read all instructions

before beginning.

Products: FP Series Covers with PKKIT, RFBKIT, RFBCIKIT, NRGKIT Barriers, & Abandonments S3AXPB, PKCAP and NRGCAP.

1. PREPARATION: Before installing Cover, repair any

cracks or chips around the Preset or Floor Box
opening using a suitable grout or repair compound.

2. FPCTC, FPBTC & FPFFTC Series – Flanged Carpet

Installation Cut opening in Carpet as indicated in illustration.

6 1/4"

[158mm]

7 7/16"

[188mm]

Radius

1/2" [12.7mm]

TRIM FLANGE INSTALLATION:

Link Strap

Adjusting Screw

Standoff

1. REMOVING THE LID (FPC & FPB Series): Pry off

Cap from Hinge Clip with small blade screwdriver to
expose “L” Pins. Roll “L” Pin down and slide inward.

“L” Pin

Cap

1a. Remove both “L” Pins and detach Lid.

3. RFB6 Installation Only – Install standoffs,

adjusting screws, and link straps as shown.

Wiremold

®

electrical systems conform to and should be properly

grounded in compliance with requirements of the current National
Electrical Code or codes administered by local authorities.

All electrical products may present a possible shock or fire
hazard if improperly installed or used. Wiremold

®

electrical products

may bear the mark of a Nationally Recognized Testing Laboratory
(NRTL) and should be installed in conformance with current local
and/or the National Electrical Code.

CAUTION: Do not operate floor scrubbers, tile strippers, or resurfacing equipment over the top of the cover. This may result in damage

to the surface of the product.

CAUTION: Wash covers with a mild soap solution. Avoid any cleaning solutions with ingredients that may react with the aluminum

construction of the products.