Legrand RC9 Poke-Thru Series User Manual

Page 3

background image

3

CAUTION: To maintain UL Fire Classification, Slide Cover

must be replaced when communication cables
are removed. Order Cat.No. RC9SHTC.

CAUTION: Gasket must be set in place to provide scrub water

seal. Do not over-tighten Cover Mounting Screws.

Step 10 Communication Wiring

For cable pass-through, remove the egress
knockout located on the underside of the cover

Step 11 Attach Slide Cover with (2) #6 screws. Pass-

through cabling must pass through internal
gasket and data slide.

Step 12 Installation complete

Step 13 RC9 Less Junction Box

Cat No. RC9A15TC-LJB, and RC9A15TCLJB25
(Applies to installations in the City of Chicago
or other locations where local codes require
the use of a communication adapter, EMT
compression fittings, and a junction box
suitable for use in environmental air spaces.)

Follow Steps 1-11 for installation.

Pass-through

knockout

Slide Cover

Mounting Screws

(2) #6-32

Align Gasket over

Receptacle and press

bead into Flange.

Attach COM75 Adapter

(included with LJB Units)
per instructions supplied

with Unit.

Cut Slot in Gasket for

Cable pass-through

Once Poke-Thru is pushed into the cored hole,
from below, install an EMT compression fitting
(not supplied) and junction box to the conduit
system. Complete installation per NEC and
local codes.