Make-Up Air Unit

7

®

Installation of Direct Gas Piping

1. Determine the Supply Gas Requirements

The unit’s direct gas nameplate states the requirements
for the gas being supplied to the unit. The direct gas
nameplate is located on the outside of the unit on the
control center side.

2. Install Additional Regulator if Required

When the supply gas pressure exceeds the maximum
gas pressure shown on the direct gas nameplate, an
additional regulator is required to reduce the pressure.
The regulator must have a listed leak limiting device or it
must be vented to the outdoors.

3. Connect the Supply Gas Line

A manual shut off valve (gas cock), 1/8 in. plugged test
port and 6 in. drip leg must be installed prior to the gas
train. The valve and the test port must be accessible for
the connection of a test gauge. Supply gas connections
must be made by a qualified installer and are not
furnished by manufacturer.

To

Controls

Gas Cock

From

Gas

Supply

6 in. Trap

1/8 in. Plugged Tap

Ground Joint Union

Supply Gas Line

NOTE

The regulator located inside the unit is used to adjust
the unit’s maximum output temperature.

Type of gas

“ W.C.

“ W.C.

“ W.C.

F

PSI

“ W.C.

“ W.C.

MAX BTU/HR

BTU/H MAX

NORMAL MANIFOLD

PRESSURE

PRESSION DÕADMISSION

NORMALE

MIN GAS

PRESSURE

PRESSION DE GAZ

MIN BURNER

PRESSURE DROP

PERTE MIN DE PRESSION

DANS LE BRULEUR

TYPE OF GAS

NATURE DU GAZ

MIN BTU/HR

BTU/H MIN

MIN GAS PRESSURE

FOR MAX OUTPUT

PRESSION DE GAZ MIN

POUR PUISSANCE MAX

MAX BURNER

PRESSURE DROP

PERTE MAX DE PRESSION

DANS LE BRULEUR

MAX GAS

PRESSURE

PRESSION DE GAZ

MAX

DESIGN ΔT
Δ

T NORMALE

EQUIPPED FOR

CONCU POUR

SCFM

“ W.C.

EXTERNAL STATIC PRESSURE

PRESSION STATIQUE EXTERIEURE

AGAINST

CONTE

Maximum gas pressure

Minimum gas pressure for

maximum output

Direct Gas Nameplate

IMPORTANT

All gas piping must be installed in accordance
with the latest edition of the National Fuel Gas
Code ANSI/Z223.1 and any local codes that may
apply. In Canada, the equipment shall be installed
in accordance with the Installation Code for Gas
Burning Appliances and Equipment (CGA B149) and
Provincial Regulations for the class. Authorities having
jurisdiction should be consulted before installations
are made.

WARNING

All components of this or any other gas-fired heating
unit must be leak tested prior to placing the unit into
operation. A soap and water solution should be used
to perform this test. NEVER test for gas leaks with an
open flame.

WARNING

When leak testing pressures that are equal to or less
than 14 in. wc (3.5 kPa), first close the field-installed
shutoff valve to isolate the unit from the gas supply
line.

WARNING

When leak testing pressures that are above 14 in. wc
(3.5 kPa), close the field-installed shutoff valve,
disconnect the furnace and gas train from the gas
supply line and plug the supply line before testing.

IMPORTANT

All piping should be clean and free of any foreign
matter. Foreign material entering the gas train can
damage the valves, regulators and burner.

IMPORTANT

Do NOT connect the unit to gas types other than
what is specified and do NOT connect the unit to
gas pressures that are outside of the pressure range
shown on the label.

NOTE

When connecting the gas supply, the length of the
run must be considered in determining the pipe size
to avoid excessive pressure drop. Refer to a Gas
Engineer’s Handbook for gas pipe capacities.