beautypg.com

Gasboy Q Series User Manual

Page 3

background image

020897 Rev. 06/12/03

Page 3

7. Install/insert the grommet (item 10) into the existing vent hole in

the left side column (view from junction box side). (Figure 6)

Figure 6

8. Remove the compression sleeve and compression nut from the

top elbow of sump overflow assembly (item 1), then pre-
assemble the sleeve and nut over the vent tube as shown in
Figure 7.

Figure 7

9. Connect the pre-assembled vent tube to the compression

elbow and insert the other end into the grommet in the side
column. (Figure 8)

Figure 8

10. Tighten all loose connections. (Figure 9)

11. Turn on power to the pump. Open the shear valve’s poppet for

fuel flow into the pump. Close and lock the doors.

Figure 9