An Example of OMR Code
In the figure the legend for the following example is shown. In this example feeder station
3 is the reading feeder. The feeder stations 1 and 2 are selected for selective feeding.
In this example, a set of 4 sheets with two selective feeds (station 2 and 1) and three
sequence check marks is shown.
• The first position is used for the start mark which must be printed on every sheet.
• The second mark position is used for the insert/accumulate command. The mark is
printed on the last sheet of the set (inserting is required).
• Position 3 and 4 are reserved for selective feeding from station 2 and 1. Print a mark
on position 3 when a selective feed from station 2 is required. Print a mark on position
4 when a selective feed from station 1 is required.
• Position 5, 6 and 7 are used for the sequence check marks.
Running an OMR test
To run an OMR test:
Before running an OMR test, select a job that uses OMR reading.
1.
In the Test menu, press the [OMR test] button. The OMR test menu appears.
2.
Press the [Test] button to start the OMR test. After the test is finished, the Result
screen appears.