DMX/DMXD/DMXH/DMXDH USER INSTRUCTIONS ENGLISH 85392728 - 10/09

Page 28 of 60

5

COMMISSIONING, START-UP,
OPERATION AND SHUTDOWN

Commissioning of all equipment must be

performed in accordance with specifications set forth
in Chapter 9, Commissioning from API
Recommended Practices 686/PIP REIE 686, First
Edition.

These operations must be carried

out by fully qualified personnel.

5.1 Precommissioning procedure

a) Never operate the pump with suction valve

closed.


b) Never operate pump unless it is filled with liquid

and vented.


c) Never operate the pump unless a liquid source is

available.

d) Never operate the pump without proper

lubrication.


5.1.1

Pre-operational checks

At initial start-up and after the equipment has been
overhauled:

a) Ensure pump and piping are clean. Before

putting the pump into operation, it should be
thoroughly flushed to remove the rust preventive
as well as any foreign matter, which may have
accumulated during installation.

Isolate the pump from pipe work, flush out the
pipe work then flush the pump. This operation
must be carried out thoroughly because the
pump contains many close running clearances,
which will be damaged by dirt particles. Take all
possible care not to contaminate your system.


b) Clean and flush bearing housings and lubrication

system. (see pump lubricants).


c) Turn rotor by hand or with strap to make sure it

turns freely.


d) Ensure that the mechanical seal is properly

assembled and tightened.

Most cartridge seals are equipped

with a spacer between the gland plate and drive

collar. This spacer must be removed before starting
unit.

e) Ensure coupling is properly aligned and

lubricated; and pump and driver are properly
doweled. (Refer to shaft /coupling alignment
procedure).


f) Ensure coupling guard is in place.

g) Check torque of all bolting and plugs for

tightness.


5.1.2

Pump instrumentation set points

The following set points apply to DMX Pumps, which
use the sleeve/KTB bearing arrangement.

a) Bearing metal temperature

Normal

60

o

C to 82

o

C (140

o

F to

180

o

F)

Alarm

85

o

C (190

o

F)

Shutdown

90

o

C (200

o

F)


b) Bearing housing vibration

Normal

2.5 to 7.6 mm/s (0.1 to

0.3 in./sec)

Alarm

10.2 mm/s (0.4 in./sec)

Shutdown

12.7 mm/s (0.5 in./sec)


c) Radial shaft vibration

Normal

0.025 to 0.050 mm (1 to

2 mils)

Alarm

0.076 mm (3 mils)

Shutdown

0.102 mm (4 mils)


5.1.3

Initial start up procedure

a) Close discharge valve if a bypass system is

used. If not, crack open the discharge valve.


b) Prepare the driver for start-up in accordance with

the manufacturer’s instructions.


c) Warm-up pump (if required).

Avoid severe thermal shocks to the pump as a result
of sudden liquid temperature changes. The pump
must be preheated prior to start-up. Unless otherwise
specified, the external temperature of the casing
must be within 55.6 °C (100 °F) of the temperature of
the liquid to be pumped at time of start-up.

Pump temperature stratification could

occur. A maximum temperature delta of 28 °C (50 °F)
between the upper and lower case shall be checked
prior to starting the pump.