Flowserve Mark 3 User Manual
Pump division, Mark 3 high silicon iron pumps
Table of contents
Document Outline
- 1 INTRODUCTION AND SAFETY
- 1.1 General
- 1.2 CE marking and approvals
- 1.3 Disclaimer
- 1.4 Copyright
- 1.5 Duty conditions
- 1.6 Safety
- 1.7 Name plate and safety labels
- 1.8 Noise level
- 2 TRANSPORT AND STORAGE
- 3 DESCRIPTION
- 3.1 Configurations
- 3.2 Nomenclature
- 3.3 Design of major parts
- 3.4 Performance and operation limits
- 4.1 Location
- 4.2 Part assemblies
- 4.3 Foundation
- 4.4 Grouting
- 4.5 Initial alignment
- 4.6 Piping
- 4.7 Electrical connections
- 4.8 Final shaft alignment check
- 4.9 Protection systems
- 5 COMMISSIONING, STARTUP, OPERATION AND SHUTDOWN
- 6 MAINTENANCE
- 6.1 Maintenance schedule
- 6.2 Spare parts
- 6.3 Recommended spares and consumable items
- 6.4 Tools required
- 6.5 Fastener torques
- 6.6 Setting impeller clearance and impeller replacement
- 6.7 Disassembly
- 6.8 Examination of parts
- 6.9 Assembly of pump and seal
- 7 FAULTS; CAUSES AND REMEDIES
- BLANK8 PARTS LIST AND DRAWINGS
- 9 CERTIFICATION
- 10 OTHER RELEVANT DOCUMENTATION AND MANUALS