Section 2. installation, Basic setup procedure – AMETEK XHR 1000 Watt Series User Manual
Page 31

31
Section 2. Installation
Basic Setup Procedure
for a summary of the basic setup procedure and an overall view of the
information in this section. Use the procedure as a quick reference if you are familiar
with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to sections which contain more details.
Execute each step in the sequence given.
Table 2.1 Basic Setup Procedure
Step # Description Action
Reference
1
Inspection
Perform an initial physical
inspection of the supply.
2
Installation
Install the supply (bench or rack
mount); ensure adequate
ventilation.
3
Input Power
Connect AC input power.
4
Test
Perform functional tests for voltage
mode operation, current mode
operation, and front panel controls.
5
Load
Connect the load.
6
Sensing
Connect sensing lines.