Nustreams-p9m led status – Xtramus NuStreams-P9M V2.1 User Manual
Page 9

9
1.4. NuStreams-P9M LED Status
The table down below contains NuStreams-P9M’s front panel LED status and their meanings.
LED
Status
Description
Power
On
NuStreams-P9M is on
Off
NuStreams-P9M’s CPU system down
On
NuStreams-P9M CPU system initializing
Green Light Blinking
NuStreams-P9M’s CPU system active and running
SYS
Yellow Light On
NuStreams-P9M is not starting properly
USB
Green Light On
NuStreams-P9M is connecting to PC via USB cable
10M/100M
Green Light On
NuStreams-P9M’s connection with DUT is active
Green Light On
WAN connection established and standing-by
Link/ACT
Green Light Blinking
Test packets sending via WAN ports
Static IP
Blue Light On
DUT WAN connection is set to Static-IP
WAN
DHCP
Amber Light On
DUT WAN connection is set to DHCP
Pass
Green Light On
DUT test passed
Fail
Red Light On
DUT test failed
Green Light On
NuStreams-P9M’s connection with DUT is active
LAN
Link/ACT
0 ~ 7
Green Light Blinking
The corresponding LAN port is performing test
1
Auto-Negotiation
2
Residential Gateway: Waiting ARP Reply
Switch: Sending Learning Packets
3
Starting DUT tests
STEP
4
Green Light On
Test complete, generating test results and report
XTRAMUS TECHNOLOGIES
®
E-mail: [email protected]
Website: www.Xtramus.com