For switch test – Xtramus NuStreams-P9M V2.1 User Manual
Page 11

11
2.2. For Switch Test
While performing tests on Switch, DUT LAN ports must be connected to NuStreams-P9M with CAT-5
UTP cables as shown in the figure down below.
If both NuStreams-P9M and the DUT are connected with CAT-5 UTP cables correctly,
NuStreams-P9M’s LAN LEDs will be ON according to the test parameter you configured previously.
XTRAMUS TECHNOLOGIES
®
E-mail: [email protected]
Website: www.Xtramus.com