Single feed operation (factory default), Split feed operation – Tempest Cyclone User Manual
Page 18

Cyclone Enclosure User Manual
page 18
Single Feed Operation (factory default)
Enclosure and projector share the same electrical circuit.
Circuit must be powered ON 24/7.
Connect incoming power to the terminals labeled MAINS:
(E) Earth/Ground
(L) Live
(N) Neutral
E L N
Split Feed Operation
Enclosure and projector have separate electrical feeds.
The enclosure circuit must be powered ON 24/7.
When splitting the feeders, both circuits should be on the same phase and at the same supply
voltage.
1 Use a wire cutter to cut the copper links on the
DEC3.2 board in four places.
2 Connect incoming ENCLOSURE power to the
terminals labeled MAINS. This supply MUST be
maintained 24/7.
(E) Earth/Ground (L) Live
(N) Neutral
3 Connect incoming PROJECTOR power to the
terminals labeled SPLIT:
(E) Earth/Ground (L) Live
(N) Neutral
Projector Supply
(split mode)
Enclosure Supply
(100-250VAC 50/60Hz)
Fan 1
Fan 2
Heater(s)
Projector
receptacle
Cut here for split
supply operation
Projector Supply
(split mode)
Enclosure Supply
(100-250VAC 50/60Hz)
Fan 1
Fan 2
Heater(s)
Projector
receptacle
Cut here for split
supply operation
E L N
Projector
Power
E L N
Enclosure
Power
1