Checklist for the assembly of t-series arrays, System and safety checks, Flown arrays – d&b T-Series User Manual
Page 38: Ground stacks, Wiring

5. Checklist for the assembly of T-Series arrays
5.1.
System and safety checks
5.1.1. Flown arrays
Before hoisting the array to its operating position recheck the actual
status of the assembly as follows:
- Check the attachment of the Load adapter(s) to the Flying frame and
ensure all Locking pins are properly locked.
- Check the attachment of the secondary safety device at the Flying
frame (refer to section 3.4 on page 17).
- Check the attachment of the Flying frame to the first cabinet (T10 or
T-SUB Front and Splay/Rear links) and ensure all Locking pins are
properly locked.
- Check the attachment of all Front links on both sides of the cabinets
and ensure all Locking pins are properly locked.
- Check the splay angles.
- Check the attachment of the Splay/Rear links at the rear of the
cabinets and ensure all Locking pins are properly locked.
- In "Single pickpoint operation" check the desired total vertical aiming
of the entire array using a inclinometer.
5.1.2. Ground stacks
- Check the attachment of all Front links on both sides of the cabinets
and ensure all Locking pins are properly locked.
- Check the splay angles.
- Check the attachment of the Splay/Rear links at the rear of the
cabinets and ensure all Locking pins are properly locked.
5.1.3. Wiring
- Check the wiring.
If the amplifiers are already wired and powered on, use their System
check function or channel mute switches and a test signal to check the
correct functioning and routing of all channels and cabinets.
T-Series Rigging manual
(1.1 EN)
Page 38 of 44