T-sub/t10 array, Preparations, Order of assembly – d&b T-Series User Manual
Page 25: Suspend the flying frame, Attach the t-sub cabinets, Prepare the first t10 cabinet, Attach the first t10 cabinet

4.1.3. T-SUB/T10 Array
WARNING!
For a mixed array consisting of T-SUB and T10 cabinets, the T-
SUB cabinets must always be positioned at the top of the array.
Preparations
- Prepare the flying cables and link cables according to the number of
amplifier channels and cabinets used.
- Ensure the HF sections of the T10 cabinets to be used are set to Line
source.
Order of assembly
1. Suspend the Flying frame
- Suspend the Flying frame according to the chosen type of suspension
as described in section 3.3 on page 15.
- Release the two Locking pins at the front of the frame.
2. Attach the T-SUB cabinets
Assembly of the T-SUB cabinets at the top of the array is carried out in
the same manner as described in the previous section 4.1.2 T-SUB
Column starting from page 23.
3. Prepare the first T10 cabinet
- Prepare the Front and Splay links of the first T10 cabinet as
described in section 2.4 on page11.
4. Attach the first T10 cabinet
- Release the upper Locking pin on the rear rigging strand of the last
T-SUB cabinet.
- On the rear hook the Splay link over the Locking pin of the T-SUB
cabinet.
- Lower the cabinet to enable the second Locking pin to be inserted.
- Insert the second Locking pin (safety pin) to secure the Splay link of
the cabinet.
T-Series Rigging manual
(1.1 EN)
Page 25 of 44