T-series ground stacks, T10 ground stack, Limitation – d&b T-Series User Manual
Page 32: Preparations, Order of assembly, Prepare the flying frame, Prepare the first t10 cabinet, Attach the first t10 cabinet

4.2.
T-Series ground stacks
WARNING!
Always secure ground stacked setups against movement and
possible tipping over.
4.2.1. T10 ground stack
Limitation
A maximum of 6 x T10 cabinets with the T Flying frame serving as
ground support are allowed to be set up as ground stack.
Preparations
- Prepare the cables and link cables according to the number of
amplifier channels and cabinets used.
- Ensure the HF sections of the T10 cabinets to be used are set to Line
source.
Order of assembly
1. Prepare the Flying frame
- Place the Flying frame on the ground with the hole index facing
downwards.
- Release the two Locking pins at the front of the frame.
2. Prepare the first T10 cabinet
- Prepare the Front and Splay links of the first T10 cabinet as
described in section 2.4 on page11.
3. Attach the first T10 cabinet
- With the Front links facing downwards attach the cabinet to the slots
at the front of the frame.
- Insert and lock the frame's Locking pins on both sides.
T-Series Rigging manual
(1.1 EN)
Page 32 of 44