beautypg.com

Rig the cabling, Check the assembly, Derig the ground stack – d&b T-Series User Manual

Page 34: T-sub/t10 ground stack, Limitation, Preparations, Order of assembly, Stack the two t-sub cabinets, Attach the first t10 cabinet

background image

6. Rig the cabling

- Connect the cables and link cables according to the number of

amplifier channels and cabinets used.

7. Check the assembly

- Recheck the assembly according to the checklist given in section 5.

Checklist for the assembly of T-Series arrays on page 38.

8. Derig the ground stack

- To dismantle the ground stack, follow the assembly instructions in

reverse order. The same safety instructions apply.

4.2.2. T-SUB/T10 ground stack

Limitation
A maximum of 3 x T10 cabinets on top of maximum 2 x T-SUB cabinets
serving as ground support are allowed to be set up as ground stack.

Preparations

- Prepare the cables and link cables according to the number of

amplifier channels and cabinets used.

- Ensure the HF sections of the T10 cabinets to be used are set to Line

source.

Order of assembly

1. Stack the two T-SUB cabinets

- Interconnect the cabinets with their Front and Rear links.

2. Attach the first T10 cabinet

- Slide out the Front links of the T-SUB cabinet.

- Release the Locking pins at the front of the T10 cabinet.

- Attach the T10 cabinet to the Front links of the T-SUB cabinet.

- Insert and lock the Locking pins for the Front links on both sides.

T-Series Rigging manual

(1.1 EN)

Page 34 of 44