CIRCUTOR CDP-0 User Manual
Page 29

CDP
Instruction Manual
29
Table 12: CDP-G programming (Single-phase installation with 3 loads to connect).
VARIABLE
VALUE
Inverter power
10000 W
Number of inverters
1
Phase control
Single-phase
Injection margin
0 %
Load management Mode
Dynamic
Max. modulation value
90 %
Max. grid contribution
50 %
Reconnecting time
5 minutes
Relay 1
Relay 2
Relay 3
Power
2000 W
Power
2000 W
Power
1000 W
Min.
connection
time
2 minutes
Min.
connection
time
2 minutes
Min.
connection
time
90 minutes
• Max. modulation value = 90%. This means that as long as the ratio be-
tween Pconsumed/Available PV Power is below 90%, the CDP-G will try to
connect the associated loads.
• Max. grid contribution = 50%. This means that as long as the load can op-
erate with less than 50% of the power in the distribution lines, the CDP-G will
keep the loads connected. If it needs more than 50% of the grid power, it will
disconnect the loads connected to the relays.
In this situation, the CDP-G checks its working conditions to connect the first
load:
• Condition 1:
𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃
𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃 𝑃𝑃𝑖𝑃𝑖𝑖𝑃𝑖
𝑥 100 ≤ 𝑀𝑚𝑥. 𝑃𝑃𝑃𝑃𝑚𝑚𝑖𝑚𝑃𝑃 𝑖𝑚𝑚𝑃𝑃
(
4000
10000
𝑥 100 = 40%) 40% ≤ 90% this condition is met
• Condition 2:
-If Injection Margin = 0%
It checks whether:
Pgrid < 2 x (0.03) x Pconsumed
-If Injection Margin
≠ 0% It checks whether:
Pgrid < 2 x Injection Margin x Pconsumed
0 < 2 x 0.03 x 4000
this condition is met
If the 2 conditions are met, the relay closes and connects
the load. (