6 commissioning, 1 wiring, 3 connection – Pilz PNOZ m EF 4DI4DOR User Manual

Page 12: Section 6, Commissioning, Wiring, Connection, 6commissioning

background image

Commissioning

Operating Manual PNOZ m EF 4DI4DOR
1002702­EN­02

12

6

Commissioning

6.1

Wiring

The wiring is defined in the circuit diagram of the PNOZmulti Configurator.

Please note:

}

Information given in the "Technical details" must be followed.

}

Use copper wire that can withstand 75°C.

6.2

Download modified project to the PNOZmulti safety system

As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat­
ing instructions for the base unit.

NOTICE

For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.

6.3

Connection

input circuit

Single­channel

Dual­channel

Example:

Emergency stop

without detection of shorts across
contacts

S1

I0

L+

S1

I1

I0

L+

L+

Example:

Emergency stop

with detection of shorts across
contacts

I0

T0

S1

S1

T1

I1

T0

I0

Connection examples for the input circuit

Dual output

O1 (3)

K1

L1

N

K2

14 (34)

13 (33)

23 (43)

24 (44)

O0 (2)