beautypg.com

Installation – Glow-worm Flue User Manual

Page 27

background image

0020095198_02 - 06/11 - Glow-worm

INSTALLATION

- 27 -

7.11 flat Roof Terminal Installation

Determine the point where the vertical air/flue duct and terminal

assembly will exit the roof.

• Fit the aluminium weather collar (2).

• Stick the flat roof penetration collar firmly into place with

adhesive in accordance with the codes of practice for flat

roofs (CP 144) to ensure a watertight seal.

• Working from above, insert the vertical roof duct (1) through

the flat roof collar and push it firmly into place.

• Vertically align the roof duct and attach it to the roof structure

with the fixing bracket (3) supplied.

• Fit the boiler hanging bracket and install the appliance

with reference to the installation and servicing instructions

supplied with the appliance.

7.12 flue Terminal cutting

DO NOT CUT THE FLUE TERMINAL should the clearances

above the appliance to the flue terminal not allow for

extensions.

7.13 fitting air/flue Duct extensions

With the flue terminal positioned in the roof, complete the

connection between terminal and adapter.

• Separate the flue duct from the terminal by twisting to

release from the securing catch inside the air/flue duct

• When cutting, cut equal amounts off the air duct and flue

duct.

• When joining extensions leave a gap of 5mm. between

each air duct this will leave a correct flue duct connection of

30mm.

noTe: For assembly reasons do not shorten any air duct to a

length of less than 80 mm. If necessary shorten two adjacent

extensions to achieve the overall required length.

noTe: See Fitting air/flue duct extensions / Fitting elbows for

further details on the installation of extensions and elbows.

• Push the sliding sleeve (6) firmly into place on the extension.

• Join the vertical roof duct (1) to the extension (4).

• Join the sliding sleeve (6) to the vertical flue adapter (5).

Using the sliding sleeve allows the appliance to be

easily removed and replaced without dismantling the

flue.

• Drill two holes 3mm Ø through the air duct of the flue/boiler

clamp at the most convienient holes on the air duct securing

clamp. (Ensure that the drill does not penetrate the inner

flue duct). Screw the air duct securing clamp to the air ducts

of the flue assembly and the vertical flue adapter using the

screws supplied.

• Ensure that any air duct securing clamps used are positioned

centrally and fixed to the air duct using the self tapping

screws supplied.

The air duct securing clamp MUST NOT be screwed

to the bottom of the vertical air/flue duct and terminal

accessory, this will allow for any slight movement in

the roof structure.

• Ensure that at least one fixing bracket supports the air/ flue

duct at each extension fitted.

7.14 fitting elbows

The elbows must be correctly aligned to avoid undue

stress on the joints and risk of leakage.

• The elbow fitted to the top of the boiler (1) should be twisted

by 3° to ensure that the second 87° elbow (2) exits the wall

perpendicular.

TERMINAL

PITCHED ROOF

82 - 90

5

SECURING

COLLAR

1.

2.

3.

4.

5.

SECURING

SCREW

SECURING

SCREW

6.

DO NOT

SECURE

FLAT ROOF

1.

TERMINAL

2.

3.

5.

82 - 90

5

SECURING

COLLAR

SECURING

SCREW

SECURING

SCREW

6.

DO NOT

SECURE