beautypg.com

Installation, A) (b) (c) (d) (e) (f) (g) (h), 6 accessories – Glow-worm Flue User Manual

Page 16: 2 installation, Check the contents of your kit

background image

0020095198_02 - 06/11 - Glow-worm

INSTALLATION

- 16 -

6 accessories

6.1

Deflector flue Terminal Kit Ø60/100

Check the contents of your kit.

Part no. 0020060582 - black

Part no. 0020060583 - White

Installation Instructions

www.glow-worm.co.uk

Deflector flue terminal kit

Part No.

A200*****

Because of our const

ant endeavour for im

provement, d

etails may vary

slightly from

those show

n in these inst

ructions.

Glow-wo

rm, Nottingham Road, B

elper, Derbyshire. DE56 1JT

0020068279-02 04 .08

General/S

ales enqu

iries:

Tel: (0177

3) 828100

Fax: (01

773) 8280

70

Installation refer to

diagram 2.

The terminal

kit fits onto the telescopic and sta

ndard

horizont

al flue, see diagram 1 for

conten

ts.

NOTE:

The deflector

terminal kit can

be fitted after the boiler

and flue have been

installed.

Remove the rubber collar (a).

Use a 8mm

. flat scr

ewdriver to bend catches inwar

ds (b).

Remove the

flue terminal

and flue duct

(c).

Remove the

flue pi

pe from

the flue term

inal by twisting them

against each other (d

).

Push the fl

ue duct into the deflector fl

ue term

inal.

NOTE:

the catch on top (i

nside) the term

inal mus

t lock firmly

into the notch o

n top of th

e flue duc

t (e).

Fit the rubber

collar

suppl

ied with the kit

(f).

Push the fl

ue duct an

d term

inal into the ai

r duct

make sure

the seals

fit tight

ly.

The defl

ector part

of the deflector

flue term

inal can be

rotated 45

o

to the left or right

if requir

ed (g).

NOTE:

Do not fit the deflector flue

terminal with t

he deflector

positioned

downwards.

If the boiler has not been fitted, contin

ue as described in the

installa

tion, servicing and user ins

tructions supplied with t

he

boiler.

To rem

ove the deflector flue

terminal from

the air duct pull

the locking strap down (h), this will r

elease the two

side

locking pos

itions (f).

14697

14696

Diagram

1

Diagram 2

For Us

e Wit

h

Glow

-worm High Efficiency

Condensing Combination

Boilers

(a)

(b)

(c)

(d)

(e)

(g)

(h)

(f)

The Deflector Flue Terminal kit will fit either the telescopic

or standard horizontal flue systems and is designed to be

rotated 45º from the top centre, directing the plume away from

openings, people, cars, windows etc.

It can be fitted after the appliance and flue have been installed.

Should the deflector terminal be positioned under a soffit or

horizontal surface, it is allowed to project the flue 600mm from

the wall, to allow the discharge of flue gases produced into free

air.

Do not fit the deflector flue terminal with the deflector

positioned downwards.

6.2

Installation

(a) If previously fitted, remove the rubber collar.

(b) Using a 8mm. flat screwdriver to release the catch.

(c) Withdraw the flue terminal and pipe from the duct.

(d) Remove the flue pipe from the terminal, twist and pull,

discard the terminal.

(e) Locate the “notch” on the pipe, align with the “catch” on the

deflector terminal and push the pipe into position, ensuring that

the engagement is secure.

(f) Fit the rubber collar

(g) Rotate the deflector to suit your requirements.

(h) Releasing Strap.

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

Push the flue pipe and terminal into the air duct, make sure the

seals fit tightly.

To remove deflector flue terminal from the air duct pull locking

strap down (h), this will release both side locking positions (f).