Installation – Glow-worm Flue User Manual
Page 19
![background image](/manuals/736780/19/background.png)
0020095198_02 - 06/11 - Glow-worm
INSTALLATION
- 19 -
6.6
Terminal siting
Refer to the diagram below and the appropriate
clearances for the flue outlet terminal in relation to
openings, air inlet etc., these must be adhered to.
The minimum siting dimensions for the terminal positions,
A, B, C stated in the diagram, can be applied when a plume
management kit is fitted.
MInIMUM sITInG foR HoRIZonTal flUe
aIR InleT
MM
A) DIRECTLY BELOW AN OPENING WINDOW
50
DIRECTLY BELOW AN OPENING, AIR BRICK 25
B) DIRECTLY ABOVE AN OPENING WINDOW
50
DIRECTLY ABOVE AN OPENING, AIR BRICK 25
C) HORIZONTALLY TO AN OPENING WINDOW
50
HORIZONTALLY TO AN OPENING, AIR BRICK 25
MInIMUM sITInG DIMensIons foR fanneD flUe
TeRMInals PosITIon
MInIMUM sITInG foR PlUMe ManaGeMenT KIT
flUe oUTleT
MM
D) DIRECTLY BELOW AN OPENING, AIR BRICK,
OPENING WINDOWS (Horizontal Discharge)
300
E) DIRECTLY ABOVE AN OPENING, AIR BRICK,
OPENING WINDOWS (Horizontal Discharge)
300
F) HORIZONTALLY TO AN OPENING, AIR BRICK,
OPENING WINDOWS
300
G) ABOVE ROOFLINE
300
For further guidance on siting requirements consult
BS 5440-1 : Table C.1
a
a
b
c
G
D,e
f
15572
The minimum length is 500mm, three examples are shown in
the diagrams below.
Additional elbows, bends and 1M extensions can be used as
required.
1M Extension (white)
A2044300
87° bend (white)
A2044700
2x45° elbows (white)
A2044500
1M Extension (black)
A2044200
87° bend (black)
A2044600
2x45° elbows (black)
A2044400
2
1
/
2
°
Horizontal
Left or Right
IMPORTANT:
Flue must always slope at least
(44mm / m)
towards the boiler
500 min. distance