Planning, Trenching, Plowing – Ditch Witch RT45 User Manual
Page 61: Rt45 operator’s manual
Operation Overview - 62
RT45 Operator’s Manual
Planning
CMW
®
Planning
1.
Gather information about jobsite. See page 66.
2.
3.
Classify jobsite. See page 68.
4.
Select chain and teeth to match your soil type, if necessary. See page 128.
5.
Check supplies and prepare equipment. See page 70.
6.
Haul equipment to jobsite. See page 81.
Trenching
1.
2.
Position tractor and controls. See page 86.
3.
4.
Complete the installation. See page 87.
5.
Backfill the trench. See page 136.
6.
Shut down tractor. See page 74.
Plowing
1.
2.
Position tractor and controls. See page 91.
3. Attach product. See page 91.
4.
5.
Complete the installation. See page 94.
6.
Shut down tractor. See page 74.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)