Rt45 operator’s manual – Ditch Witch RT45 User Manual
Page 172

RT45 Operator’s Manual
Service - 175
As Needed
CMW
®
8.
Loop cable through links nearest connector
pin.
9.
Loosen plug on grease cylinder or turn tension bolts counterclockwise to relieve chain tension.
10. Stand clear of chain and remove lock key from connector pin. Drive connector pin out of link.
11. Unclamp links. Slowly release cable and lower chain to ground.
12. Lay chain on ground with teeth down.
Fluid pressure could pierce skin and cause injury
or death. Stay away.
To help avoid injury:
•
Service digging boom grease cylinder only while standing on opposite side of boom.
•
Wear gloves and safety glasses, and cover fitting with cloth when relieving pressure in
cylinder.
Crushing weight could cause death or serious
injury. Use proper procedures and equipment or stay away.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)