Trencher, Rt45 operator’s manual – Ditch Witch RT45 User Manual
Page 171

Service - 174
RT45 Operator’s Manual
As Needed
CMW
®
Trencher
Replace Digging Chain
Visually check digging chains for wear on rollers
and sidebars (2). Check pins (3) and bushing wear
by measuring distance between chain pins and
comparing it with a new chain. Also check digging
teeth (1).
To remove chain:
1.
Fasten and adjust seat belt.
2.
Start tractor. See page 72 for proper start-up
procedures.
3.
Move attachment direction/speed control
until digging chain connector pin is on top of
boom.
4.
Lower boom to ground.
5.
Engage parking brake.
6.
Turn ignition switch to STOP.
7.
Roller booms: Secure chain by clamping
links on either side of connector pin with
chain jaws (shown). Squeeze jaws to
reduce pressure on connector pin.
Sprocket booms: Lock rear idler sprocket.
NOTICE: Replace sprockets when a new chain
is installed.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)