Rt45 operator’s manual – Ditch Witch RT45 User Manual
Page 147
Service - 150
RT45 Operator’s Manual
10 Hour
CMW
®
Roller Boom with Adjusting Screw
With boom horizontal, measure distance from
bottom of boom to chain (3). When properly
adjusted, distance should be 1.5-2” (40-50 mm).
Adjust tension by tightening or loosening
adjustment screw (1) and jam nut (2).
Roller Boom with Grease Cylinder
With boom horizontal, measure distance from
bottom of boom to chain (2). When properly
adjusted, distance should be 1.5-2.0” (40-50 mm).
To tighten chain, remove plug and pump MPG into cylinder (1). To relieve chain tension, loosen plug on
grease cylinder.
Fluid pressure could pierce skin and cause
injury or death. Stay away.
To help avoid injury:
•
Service digging boom grease cylinder only
while standing on opposite side of boom.
•
Wear gloves and safety glasses, and cover
fitting with cloth when relieving pressure in
cylinder.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)