Fx50 operator’s manual – Ditch Witch FXT50 User Manual
Page 94
FX50 Operator’s Manual
Service - 93
50 Hour
CMW
Check Blower Relief Valve
Check relief valve for proper operation every 50
hours.
To check:
1.
Ensure that vacuum inlet valve and drain
valve are both closed.
2.
Start engine. Vacuum will start to build.
3.
When vacuum goes over relief, check for
suction at the bottom of the relief air filter.
If suction is not present, stop engine and
check relief valve.
Check Water Pressure Hoses
Check hoses every 50 hours for wear or damage.
Replace as needed.
j36om068w.eps
j36om030w.eps
This manual is related to the following products:
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)