6 > pdu outlet grouping – Austin Hughes X-600 Smartcard Handle User Manual
Page 81
www.austin-hughes.com
UM-X-600-ISM-Q214V2
P.76
8. Select the PDU you want to add to this schedule by Clicking “ Unassigned List “ > “ MFP “ > “ Cabinet “ >
“ PDU “ in MFP pane
If the PDU already assigned to another outlet schedule
in the same outlet grouping, you can select the PDU in
the “ Assigned List “
9. Tick the outlet of the selected PDU for the schedule
10. Repeat step 9 for outlet ( s ) of other PDU ( s ) you want to add to the same schedule
11. Click “ Save “ to fi nish
12. Repeat Step 2 to 11 for other schedules if necessary
If the outlet schedule is “ Once “, the schedule will be disabled automatically once the action is completed.
To cancel the outlet schedule, select “ Disable “ of the selected schedule & Click “ Save “ to fi nish
< 12.6 > PDU Outlet Grouping