Arrow Storage Products CM1014 User Manual
Arrow, Worid’s leading, Buildings
This manual is related to the following products:
Table of contents
Document Outline
- Other Tips..»
- The Foundation For Your Building
- If you decide to build your own foundation, be sure to select the appropriate materials.
- To construct the foundation follow instructions and diagram.
- Allow 6 - 7 hours for construction.
- The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame. The following are the recommended materials for your foundation.
- Prepare the Site/Construct a Foundation
- Allow 3-5 hours for construction and a week for concrete curing time.
- Anchoring Down The Building
- • Parts Needed For • Floor Frame Assemblies
- step 2
- step 5
- step 6
- step?
- step 11
- step 12
- step 14
- step 17
- step 18
- step 19
- step 20